The First Unit of Tianshengqiao No.1 Hydropower Station and Tian-Guang 500 kV Second Line Commissioned
The First Unit of Tianshengqiao No.1 Hydropower Station and Tian-Guang 500 kV Second Line Commissioned
-
1如何清洗微波炉[J].家庭百事通,2010(3):54-54.
-
2林海雪,刘军成.No.1 IEC电能质量标准化的进展[J].供用电,2015,32(10):43-50. 被引量:1
-
3Zhanghewan Pumped-Storage Power Station under construction[J].Electricity,2003(4):15-15.
-
4吴金龙.IEC网站近期发布的标准No.1/2004-1[J].电器工业,2004(3):52-54.
-
5梁秀璟.三菱电机自动化:2025年,成为中国FA市场的NO.1[J].自动化博览,2017,34(3):20-21.
-
6努尔买买提,夏熙.α-MnO_2的制备及其电化学性能[J].电池,2000,30(4):150-152. 被引量:10
-
7Liu Chunsheng.Jin'anqiao Hydropower Station started operation[J].Electricity,2011,22(2):52-52.
-
8万绍尤.GB 14048.2-2001《低压开关设备和控制设备低压断路器》修订后已批准为GB 14048.2—2008[J].电世界,2009,50(3):8-9.
-
9Two 140 MW cogeneration units will be installed in the Beijing No.1 Cogeneration Power Plant[J].Electricity,1997(2):7-7.
-
10贾常艳.走出去,打造全球电机行业的No.1——访卧龙电气集团股份有限公司董事长王建乔[J].电器工业,2015(5):61-63.