摘要
结合安庆发电厂工程建筑特点,通过综合试桩选择桩型,确保桩基工程的科学性、可靠性,和经济上的合理性,达到节省投资、缩短工期、优化设计、指导施工及对工程质量有效监督的目的。
This paper is combination an project architecture hallmark for Anqing Electric power plant, through a comprehensive pile test chose an pile model, ensure a pile foundation project sci-ence、authenticity and principle in economy,for to festival invest、shorten period of time、opti-mum design、guide execute and hold supervise engineering quality.
出处
《电力勘测设计》
1998年第3期19-24,共6页
Electric Power Survey & Design