摘要
GPS300实时动态系统RTK应用在F市城区东北郊变开断进南门变220kV架空送电线路工程中,对其在作业中存在的问题和精度提出一些看法。以便能更好地发挥RTK技术在线路测量中的应用。
This paper gives a description of the application of GPS300 real time dynamic systemRTK to teh 220kV overhead power transmission line engineering from northeast suburb. Substation to the nanmen Substation of F city,it also presents certain ideas and solutions to some existingproblems in operation and preeisions,so that the RTK technology can be better used in line surveying
出处
《电力勘测设计》
1998年第2期33-39,共7页
Electric Power Survey & Design