摘要
汕头LPG工程的交通洞为一宽7.2m、高5.7m、断面约40m2、13.6%下坡道的隧道。1998年2月9日当隧道开挖到245m处,爆破以后,在隧道底板的右侧突发涌水,其涌水量较大,根据观测约为1500m3/d。本文主要介绍通过注浆堵水施工的全过程,从而取得可供类似工程借鉴的经验。
The communication cavern of LPG engineering project in Shantou City is a tunnel with the width 7.2 m,height 5.7 m,cross section nearly 40 m 2 and having a down gradient of 13.6%.After blasting during the excavation of tunnel reaching 245 m length at February 9 of 1998,the gushing water occurred suddenly at the right side on the bottom of the tunnel.The capacity of gushing water was rather high,nearly 1500 m 3/d through the observation and test.The paper introduces mainly the whole procedure of the flood protection engineering treatment by grouting in detail,and therefore,provides the experience as a reference for the similar engineering project.
出处
《铁道工程学报》
EI
1998年第4期146-149,152-154,共7页
Journal of Railway Engineering Society
关键词
涌水
注浆
堵水
施工
gushing water
grouting
flood protection
construction