摘要
介绍百色水利枢纽主坝工程人工砂石料加工系统的生产规模、工艺流程、主要设备的选择与配置、系统的平面布置、环保措施、生产过程中质量控制。
For the artificial aggregate fabricating system of Baise multipurpose dam project, the author introduce the production capacity, technological chain, selection and configuration of major equipment, system arrangement plan, environmental protection measures, quality control in course of production, power supply for and electrical control of system, problem arising during operation and improvement
出处
《广西水利水电》
2004年第B05期83-86,共4页
Guangxi Water Resources & Hydropower Engineering