摘要
从碾压混凝土大坝的结构设计、温控方案到施工组织设计等进行了探讨 ,特别是提出了非温控施工时段、简单温控施工时段及严格温控施工时段三个概念 。
The author probe into the structural design, temperature control and construction organization of RCC dam. The three concepts of no-temperature control period, ordinary temperature control period and strict temperature control period they put forward are meaningful for reducing construction cost.
出处
《广西水利水电》
2004年第B05期124-127,共4页
Guangxi Water Resources & Hydropower Engineering