在百色水利枢纽导流隧洞施工过程中 ,根据实际地质情况 ,结合施工条件及工期要求 ,进行的多项施工优化方案 ,保证了工程质量和施工安全 ,同时缩短了施工工期 ,降低了工程造价。
In the course of the diversion tunnel construction of Baise multipurpose dam project, according to the real topographical and geological condition, in consideration of construction condition and time requirement, continuous optimization of construction scheme not only ensure the engineering quality and construction safety, but also shorten construction period and reduce construction cost.
出处
《广西水利水电》
2004年第B05期131-133,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
百色水利枢纽
导流隧洞
施工安全
工程质量
工程造价
Baise multipurpose dam project
diversion tunnel
construction
scheme
optimization