摘要
针对桥梁挖孔灌注桩施工可能发生的质量问题 ,提出工程预控措施 ,并根据实际对工程施工的三个环节严格控制 ,确保工程质量。
In view of the quality problem that may occur during the construction of bridge digging filling pile, the author put forward preventing measures, emphasize strict quality control of three links based on real condition, so as to ensure the construction quality.
出处
《广西水利水电》
2004年第B05期139-140,145,共3页
Guangxi Water Resources & Hydropower Engineering