Development of New Techniques in Basin Integrated Modeling
Development of New Techniques in Basin Integrated Modeling
-
1Zang Tiejun and Zang Tianhong(Northeast Oil Transportation Bureau, CNPC).Oil/gas Pipeline Development in China[J].China Oil & Gas,1998,5(3):149-151.
-
2Statistics of Chinese Oil/Gas Production,Petroleum Drilling and Geophysical Surve[J].China Oil & Gas,1999,6(1):6-6.
-
3Construction of Refining/Chemical Integrated Project in Yueyang Area Officially Commenced[J].China Petroleum Processing & Petrochemical Technology,2008,10(4):51-51.
-
4Construction of 1.40 Mt/a Integrated Catalytic Reforming/Disproportionation Unit Kicked off at Liaoyang Petrochemical Company[J].China Petroleum Processing & Petrochemical Technology,2009,11(1):6-6.
-
5外刊题录[J].石油地球物理勘探,1990,25(3):374-376.
-
6Li Gansheng (Exploration Bureau, CNPC)Dou Lirong (Research Institute of Petroleum Exploration and Development, CNPC).Prospect of Oil/Gas Exploration in Beach Areaof Bohai Bay Basin[J].China Oil & Gas,1997,4(3):156-157.
-
7于恩礼.外国石油公司动态[J].国际石油经济,2014,22(5):101-104.
-
8Zhang Zhilin(Design & Research institute, Sichuan Petroleum Adminisiration).Natural Gas Gathering and Purification in Sichuan Gas Fields[J].China Oil & Gas,1996,3(3):153-155.
-
9Li Chunguang(Senior Engineer,Geological Scientific Research Institute,Shengli Petroleum Administration)Shang Weirong(Foreign Affairs Department, Shengli Petroleum Administration).Hydrocarbon Migration and Accumulation in Dongying Basin[J].China Oil & Gas,1996,3(3):177-179.
-
10外刊题录[J].石油地球物理勘探,1991,26(1):125-127.