总结金鸡山隧道的方案比选、结构设计、防水设计以及现场监控量测.由于实施动态设计,使隧道的结构更合理,使隧道施工能快速、安全地完成.
This article summarizes the selection of design proposals of Jinji Mountain Tunnel, the design of its structure, the design of waterproof and the monitoring measure in the site. Because of the implementation of dynamic design, the structure of the tunnel is more reasonable, so the construction could be finished quickly and safely.
出处
《福州大学学报(自然科学版)》
CAS
CSCD
1997年第S1期101-105,共5页
Journal of Fuzhou University(Natural Science Edition)