摘要
简介桂江昭平水电站的厂区、厂房布置,对进水口预制结构以及主厂房上部结构、尾水管结构、安装间下部结构和主机间伸缩缝等主要结构设计特点进行概述。
A brief introduction is made about the design of Zhaoping HPP, including arrangement of plant area and powerhouse, structural design of prefabricated intake structures, upper structures of main powerhouse, draft tube, structures under erection bay, and expansion joints in main powerhouse.
出处
《广西水利水电》
2004年第2期62-64,共3页
Guangxi Water Resources & Hydropower Engineering