摘要
介绍百色水利枢纽宽尾墩下游消力池动水荷载水工模型试验的必要性、研究内容、测点布置情况以及分析测点数据得出的池内动水压力分布规律。
Hydraulic model test had been conducted to study the Hydrodynamic load distribution in stilling pool downstream of the tail_flaring piers of Baise RCC main dam. The necessity, content and measuring point location of test is introduced. The hydrodynamic load distribution in stilling pool is calculated out of the analysis on the testing results.
出处
《广西水利水电》
2004年第2期82-85,共4页
Guangxi Water Resources & Hydropower Engineering