期刊文献+

预拱度计算设置的绝对挠度法 被引量:19

ABSOLUTE DEFLECTION METHOD BASED ON PRE-ARCHED CALCULATION AND INSTALLATION
下载PDF
导出
摘要 各种型式的铁路及公路大跨度预应力混凝土桥梁广泛采用节段施工方法,挠度及预拱度的计算和设置是施工控制的关键技术.本文在对现行的基于相对挠度的预拱度计算设置方法进行分析后,进而提出了新的绝对挠度法。理论分析及实际应用证明,新方法正确可靠,便于推广应用,能明显提高桥梁施工控制质量。 or different types of the railway and the highway long-span prestressed concrete bridges,the construction method of building bridges section by section has been widely adopted,in which the deflection and the pre-arched calculation and installation are the key technique for engineering control. The pace analyzes the current pre-arched calculation and installation method based on the relative deflections,and proposes a new absolute deflection method. The theoretical analysis and pratical applications proof that the new method is proper and reliable, easy to be applied and populared,and able to raise obviously control quslity of building bridges.
作者 段明德
出处 《铁道工程学报》 EI 1996年第3期67-71,共5页 Journal of Railway Engineering Society
关键词 预拱度计算 绝对挠度法 pre-arched calculation absolute deflection method
  • 相关文献

参考文献2

二级参考文献3

  • 1郑信光,同济大学学报,1991年,19卷,3期
  • 2陈德伟,1990年
  • 3陈德伟,城市道桥与防洪,1988年,1期

共引文献67

同被引文献55

引证文献19

二级引证文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部