摘要
本文系统地介绍了我国第一条盐湖铁路工程实践的全过程。通过对盐湖与盐渍土地区筑路的一些重大技术问题,诸如盐湖发展趋势、盐湖岩盐强度与稳定性、地表通流对盐湖的影响、超氯盐渍土可否作填料及地基盐壳可否不铲除等的圆满解决,成功地设计了路基工程,运行表明路基工程状况良好。
This paper introduces the first railway across the salt-lake in Chins.By resovlingsome important technological problems on construction road through the salt-lake and salinized soil area,such as the salt-lake development, salty rock strength and stability,effect onthe salt-lake by streams,whether ultra-chloric salty soil can be used as filling and the salt incrustation can be rooted,etc,the subgrade has been built up successfully,it is in good condition by practice.