期刊文献+

山东横河煤矿分层开采防水煤柱留设 被引量:3

THE ESTABLISHMENT OF WATER-PREVENTING COAL PILLARS OF SLICE MINING IN HENGHE COAL MINE, SHANDONG PROVINCE
下载PDF
导出
摘要 防水煤(岩)柱的留设是保证水体下采煤安全的有效措施之一,其高度取决于覆岩破坏带的高度及上覆岩上层的水文地质条件,本文在详细分析了横河煤矿水文地质条件和工程地质条件的基础上,建立计算机模型预测了该矿3号煤开采后覆岩破坏带高度,进而确定了松散含水层下开采防水煤岩柱的高度,开采结果已初步证明了其正确性。 The establishment of water-preventing coal/rock pillars is one of the most effective methods to keep mining safety under water body and its height depends on the height of fractured zone due to mining and the hydrogeological conditions of overburden soils and rocks. In this paper, on the basis of the analysis of hydrogeological and engineering geological conditions in Henghe Coal Mine, the calculation model was set up to predict the height of fractured zone due to slice mining of coal seam No. 3. Then, the height of waterpreventing coal/rock pillars under unconsolidated aquifers was determined and the result has been proved preliminarily by the mining practice.
机构地区 山东省横河煤矿
出处 《中国地质灾害与防治学报》 CSCD 1994年第S1期144-146,195,共4页 The Chinese Journal of Geological Hazard and Control
关键词 防水煤(岩)柱 导水裂隙带 water-preventing coal pillar, water-flowing fissure
  • 相关文献

同被引文献17

引证文献3

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部