摘要
本文概述了云南省巧家县白泥沟综合治理工程。工程以泥石流的拦挡排等硬性措施、水土流失的开发性治理和扇形地的改造利用为主要目的,在控制泥石流爆发的频率和规模的基础上,获取巨大的经济效益。
To find out a comprehensive debris flow controlling model in the dry and hot vally of the lower Jinsa River. Our bureau has extended an engineering, called Baini Gully comprehensive controlling work. This work aims at exploitatively controlling debris flow and the fan utilization, with engineering measures include: flood control dam、block dams and drainages. On the base of controlling the debris flow within lower frequency and smaller scale. These measures have been made sure to be of great economic benefit.
出处
《中国地质灾害与防治学报》
CSCD
1994年第1期69-72,共4页
The Chinese Journal of Geological Hazard and Control
关键词
泥石流
防治工程
生态环境
社会效应
debris flow, prevention and cure engineering, ecologic setting, socialbenefit