摘要
强击沉管灌注桩在淤泥地区中施工,对邻桩有较大的影响,需确定合理的“跳桩”时间.试验证明,在淤泥地区进行强击式沉管灌注桩施工,设计桩距小于2.5倍桩径时,应在邻桩灌注混凝土初凝期后才能施工.本文对一般沉管灌注桩施工.亦有参考价值.
he construction of heavy hammered pipe pile in muck is of influence on the adjacent ones to a greet extent,so the interval. It is shown by tewt that the heavy hammered pipe pile should be constructed only after initial cementing period of concrere of adjacent ones when the pile spacing is less then 2 meters. The test results are of certain reference signaficance for the construction of ordinary heavy hammered pipe pile.
出处
《广东工业大学学报》
CAS
1994年第2期57-60,共4页
Journal of Guangdong University of Technology
关键词
强击沉管灌注桩
跳桩
跳桩间距
跳桩时间
heavy hammered pipe pile: staggered piling
staggered pile spacing
interd of staggered piling