摘要
1.IntroductionAn obvious improvement in designing and manufacturingtransformers has been achieved since the application of partial dis-charge (PD) test on power transformers was accepted.ChineseNational Standard has stipulated that PD test is a routine item fortransformers with rated voltage 220 kV and above.Many transform-