摘要
As the development of the net-work,the rapidly increasingcharging reactive power caused by the con-struction of EHV long distance transmissionlines,especially the commissioning of 500kV transmission lines in many large powersystems,has been a problem to be solved.At the same time,a number of power ca-pacitors are installed in the distribution