期刊文献+

Earth resistivity measurements for HVDC ground electrodes and line design

Earth resistivity measurements for HVDC ground electrodes and line design
下载PDF
导出
摘要 The first ±500 kV project (bipolar),Gezhouba to ShanghaiHVDC project,has been set up and put into operation in1990 in China.The HVDC line is 1000 km long,interconnecting the centraland east electric power networks of China.It is necessary to measure the extensive earth resistivity
出处 《Electricity》 1991年第1期53-54,共2页 电气(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部