多水合一设计方案在华能临沂工程遇到的问题及对策 被引量:1

Problems and Solutions of All-in-one Water Treatment Design Scheme in Huaneng Linyi Project
下载PDF
导出
摘要 华能临沂工程多水合一施工图设计过程中,通过与土建等相关专业同步设计,同步改进,解决了变空隙滤池局部荷载过大、水泵间多台水泵共振、废水池排气与防腐、水处理室管道布置、室内设备排水、室外管沟与排水沟交叉等诸多问题。为后续施工图设计积累了经验,有利于完善系统设计。 In the practice process of all-in-one water treatment construction drawing,these problems,including filter tank high-load,water pumps resonance vibration,waste water tank anti-corrosion and vent and so on,were solved by synchronization design and synchronization improvement between chemistry and mechanical and other related field.The authers carried out experiences that were conductive to future detail design and improving system design.
出处 《湖北电力》 2014年第6期61-64,共4页 Hubei Electric Power
关键词 水处理 多水合一 节能减排 节约占地 节省投资 提高效率 Water treatment all-in-one energy-saving and emission-reduction save the land low investment high efficiency
  • 相关文献

参考文献2

  • 1DL/T 5046-2006.火力发电厂废水治理设计技术规程[S]..2006
  • 2DL/T 5068-2006.火力发电厂化学设计技术规程[S]..2006

同被引文献12

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部