摘要
文章介绍了邹庄煤矿主井箕斗装载硐室施工技术,施工中采用锚网棚索喷注一次支护,现浇钢筋混凝土二次支护,确保了工程质量和安全,为其它松软、破碎岩层施工大断面硐室积累了一定的经验。
That paper introduces the Main Shaft Zou Skip loading chamber construction process,using a cable mesh roof support,cast concrete secondary support,ensuring quality and safety,as the other soft,broken rock construction large cross section chamber accumulated some experience.
出处
《山东煤炭科技》
2013年第4期114-115,共2页
Shandong Coal Science and Technology
关键词
软岩破碎岩层
箕斗装载硐室
安全快速施工
soft rock strata
Skip loading chamber
Safety and Rapid Construction