期刊文献+

济三煤矿副井提升机电控系统改造应用研究 被引量:1

Jining 3# coal mine auxiliary shaft hoist control system transformation
下载PDF
导出
摘要 矿井提升机是矿山生产的关键设备之一,其作用是提升煤炭、矸石、升降人员和设备物料等,在整个矿山生产中占有十分重要的地位。文章针对副井提升机电控系统改造控制设备多、控制系统复杂、安全程度要求高等因素,结合济三煤矿电控系统改造项目,对电控系统改造中常见的问题进行了介绍和探讨。 Mine hoist is one of the key equipment in mine production,and its role is to promote coal,gangue,the movements of personnel and equip-ment,lowering materials,occupies a very important position in the whole mine production. According to the mine auxiliary hoist electrical control system control equipment,control systems,safety requirements higher complex factors,combined with Jining 3#coal mine upgrade project,application of com-mon electronic control system reformation are introduced and discussed.
出处 《山东煤炭科技》 2013年第4期248-249,共2页 Shandong Coal Science and Technology
关键词 副井 提升机 电控系统 改造 auxiliary shaft hoist electrical control system transformation
  • 相关文献

参考文献3

二级参考文献6

  • 1周乃荣 等.矿山固定机械手册[M].煤炭工业出版社,1986..
  • 2李虹.变频调速在矿山节能中的应用.变频器世界,2003,(8).
  • 3胡建.西门子S7-300PLC应用教程[M].北京:机械工业出版社,2007.
  • 4李鹤轩.变频器技术的发展趋势[N].中国机电日报;2001年.
  • 5艾默生网络能源有限公司.EV2000系列通用变频器用户手册[Z],2000.
  • 6山东风光电子有限责任有限公司.JD-BP32系列提升机变频器运行报告[Z].山东,2001.

共引文献8

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部