摘要
为有效监控新型结构、材料和施工工艺在砌石重力坝加高工程中的应用效果,了解施工期及运行期大坝安全性态的发展,对清凉山实测资料进行了全面分析。资料分析表明,新型结构设计合理,新旧大坝结合良好,大坝工作性态良好。
For the effective monitoring application effect such as heightening structure,material and construction technology in masonry gravity dam heightening,and also to understand the dam behaviors during construction period and operation period, the measured data of Qingliangshan reservoir are analyzed.Data analysis shows that,the design model is reasonable in structure,new-old parts are in good inseparable,and dam is good working state.