摘要
金沙湾护岸工程是宁夏集交通、水利为一体的重点水利工程,根据工程的地质条件、洪水及水文特点,对工程设计方案进行了多方面的比较,提出符合工程实际的设计方案,同时优化灌注桩及井柱设计,最大可能地节省了工程投资.
Jinshawan revetment project was key water conservancy engineering in Ningxia Autonomous Region,which combined with transportation and water conservancy.According to geological conditions,floods and hydrological characteristics,compared various scheme in design,a design which meets actual engineering was proposed,and pile and pillar design were optimized,the project investment saved in maximum.
出处
《宁夏工程技术》
CAS
2013年第3期262-266,共5页
Ningxia Engineering Technology
关键词
金沙湾
灌注桩
井柱
设计
Jinshawan
piles
well column
design