6Babu A J, GSuresh Nalina. Project management with time, cost, and quality considerations [ J ]. European Journal of Operational Research, 1996,88 ( 2 ) : 320-327.
7El-Rayes Khaled, Kandil Amr. Time-Cost-Quality trade - off analysis for highway construction[J]. Journal of Construction Engineering and Management,2005, 131 (4) :477-486.
8Deb K,Agrawal S,Pratap A,Meyarivan T. A fast elitist non-dominated sorting genetic algorithm for multi-objective optimization: NAGAⅡ[ A]. KanGAL Report No. 2000001. Kanpur,India: Indian Institute of Technology[ C ]. 2000.
9Daisy X M Zheng S. Thomas Ng,Mohan M. Kumaraswamy. Applying Pareto Ranking and Niche Formation to Genetic Algorithm - Based Multi - objective Time-Cost Optimization [ J ]. Journal of Construction Engineering and Management ,2005,131 ( 1 ) :81-91.
10Kalyanmoy Deb. A Fast and Elitist Mulfiobjective Genetic Algorithm: NSGA-Ⅱ[J]. IEEE Transactions on Evolutionary Computation ,2002,6 ( 2 ) : 182-197.