期刊文献+

Self-reliance and Innovation of Qinshan Phase Ⅱ NPP Project

Self-reliance and Innovation of Qinshan Phase Ⅱ NPP Project
下载PDF
导出
摘要 This article mainly describes the self-reliance and innovation of Qinshan nuclear power project of phase II,in-between it contains new reactor core design,as well as related experimental and calculation analysis,especially for new reactor design produced fluid-induced vibration model test,theoretical analysis and testing in-built reactor;aiming at two-loop NSSS a series improvement made for safety systems and related safety analysis to enhance their reliability and redundancy;according to specialty of two-loop NSSS an optimization made for NPP parameters and design of related equipments,for the purpose to make the output of NPP maximal;design of main reactor building and T-G building also improved according to characteristics of two-loop NSSS and site conditions.CRDM and refueling machine are researched and manufactured on base of self-reliance,their performance are better than design requirements,large portion of key equipments are localized through different way.In construction first time realized the integrated erection of containment dome.During the commissioning non-nuclear steam driving of T-G set,as well as 500 kV high voltage rising using emergent diesel generator,etc.are carried out.In period of operation still continuous innovation and improvement are made,so that to keep the good record of operation. This article mainly describes the self-reliance and innovation of Qinshan nuclear power project of phase II,in-between it contains new reactor core design,as well as related experimental and calculation analysis,especially for new reactor design produced fluid-induced vibration model test,theoretical analysis and testing in-built reactor;aiming at two-loop NSSS a series improvement made for safety systems and related safety analysis to enhance their reliability and redundancy;according to specialty of two-loop NSSS an optimization made for NPP parameters and design of related equipments,for the purpose to make the output of NPP maximal;design of main reactor building and T-G building also improved according to characteristics of two-loop NSSS and site conditions.CRDM and refueling machine are researched and manufactured on base of self-reliance,their performance are better than design requirements,large portion of key equipments are localized through different way.In construction first time realized the integrated erection of containment dome.During the commissioning non-nuclear steam driving of T-G set,as well as 500 kV high voltage rising using emergent diesel generator,etc.are carried out.In period of operation still continuous innovation and improvement are made,so that to keep the good record of operation.
出处 《工程科学(英文版)》 2007年第4期20-35,共16页 Engineering Sciences
关键词 NUCLEAR POWER PROJECT PHASE nuclear power project phase Ⅱ
  • 相关文献

参考文献12

  • 1Ye Qizhen.Design and construction of Qinshan600MWe NPP. Construction ExperimentCollection of Qinshan NPP PhaseⅡ . 2004
  • 2Li Chengde.Design specialty of conventional main building. Construction Experiment Collection of Qinshan NPP PhaseⅡ . 2004
  • 3Li Hongying.CRDMdesign of Qinshan nuclear power project phaseⅡ. Construction Ex-periment Collection of Qinshan NPP PhaseⅡ . 2004
  • 4Tang Xinhuang.Refueling machine[A].Con-struction Experiment Collection of Qinshan NPP PhaseⅡ. . 2004
  • 5Yang Lanhe,etc.Organization and management for production preparation of Qinshan second NPP. Construction Experiment Collection of Qins-han NPP PhaseⅡ . 2004
  • 6Yu Zhongde.Specialty and meaning of self-reliance commissioning of Qinshan nuclear power units phaseⅡ. Construction ExperimentCol-lection of Qinshan NPP PhaseⅡ . 2004
  • 7Zhang Zongyao,et al.The reactor core design of Qinshan nuclear power project phaseⅡ. Construction Experiment Collection of Qinshan NPP PhaseⅡ . 2004
  • 8Zong Guifang,et al.600MWe reactor hydraulic model experimental investigation of Qinshan nu-clear power project phaseⅡ. Construction Experiment Collection of Qinshan NPP PhaseⅡ . 2004
  • 9Wu Zhenglin,Zhang Jingcai.General evaluation of reactor internal fluid-induced vibration of Qins-han600MWe NPP phaseⅡ. Construction Experiment Collection of Qinshan NPP PhaseⅡ . 2004
  • 10Ma Jianzhong,,Yang Yilun.Reactor barrel fluid-induced vibration response calculation of600MWe NPP. Construction Experiment Collec-tion of Qinshan NPP PhaseⅡ . 2004