Technical Breakthroughs in the Construction of TGP

Technical Breakthroughs in the Construction of TGP
下载PDF
导出
摘要 The huge Three Gorges Project is technically complex. Quite a lot of technical breakthroughs have been made in such issues as river closure of the Grand Channel and the concrete construction of the cutoff wall, prompt concrete construction of the dam, high slope construction of the permanent shiplock, the large scale steel lined reinforced concrete penstocks of the power station, and the temperature and pressure maintenance of the spiral case, the asphalt concrete core wall, the metal works of the shiplock, and turbine generating units. The huge Three Gorges Project is technically complex. Quite a lot of technical breakthroughs have been made in such issues as river closure of the Grand Channel and the concrete construction of the cutoff wall, prompt concrete construction of the dam, high slope construction of the permanent shiplock, the large scale steel lined reinforced concrete penstocks of the power station, and the temperature and pressure maintenance of the spiral case, the asphalt concrete core wall, the metal works of the shiplock, and turbine generating units.
出处 《工程科学(英文版)》 2003年第1期8-14,98,共8页 Engineering Sciences
关键词 river CLOSURE CUTOFF WALL high slope steel lined reinforced CONCRETE temperature and pressure maintenance ASPHALT CONCRETE core WALL turbine GENERATING units river closure cutoff wall high slope steel lined reinforced concrete temperature and pressure maintenance asphalt concrete core wall turbine generating units
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部