An Analysis of the Designed Performance and Structural Characteristics of the Turbine Generating Units of TGP 被引量:1

An Analysis of the Designed Performance and Structural Characteristics of the Turbine Generating Units of TGP
下载PDF
导出
摘要 The main technical requirement of the turbine generating units for the Three Gorges Project (TGP) has a basic conclusion through a long term study and research as well as demonstration.Along with the TGP construction and successful execution of the contract of turbine generating units,the technical difficulties concerning the performance and structure of turbine generating units have been further recognized.In this paper some issues are discussed and analyzed in connection with a deep going cognition of turbine generating units for TGP during the period of design, manufacture and installation. The main technical requirement of the turbine generating units for the Three Gorges Project (TGP) has a basic conclusion through a long term study and research as well as demonstration.Along with the TGP construction and successful execution of the contract of turbine generating units,the technical difficulties concerning the performance and structure of turbine generating units have been further recognized.In this paper some issues are discussed and analyzed in connection with a deep going cognition of turbine generating units for TGP during the period of design, manufacture and installation.
出处 《工程科学(英文版)》 2003年第1期47-52,共6页 Engineering Sciences
关键词 Three Gorges Project TURBINE GENERATING UNITS TECHNICAL problems DISCUSSION and ANALYSIS Three Gorges Project turbine generating units technical problems discussion and analysis
  • 相关文献

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部