本文介绍了开滦钱家营矿业分公司八采区皮带煤仓转载工程的卸载硐室、煤仓、给煤机硐室的施工工艺 ,采用合理、先进的施工方案 ,实现了安全、优质、高效。
In this article, the writers explain the constructing technology of unloading gallery, coalbunker and loading gallery that make up a transfer building In The Eighth Coal District of Qianying Coal Mine of Kailuan Group Company. It had been adopted that rational and advanced constructing project so that the safety, high quality and efficient work had been gained in production.
出处
《河北能源职业技术学院学报》
2004年第2期69-71,共3页
Journal of Hebei Energy College of Vocation and Technology
关键词
卸载硐室
煤仓
给煤机硐室
交叉施工
unloading gallery
coal bunker
loading gallery
alternate work