摘要
本文简要论述了三峡工程机电方面的几个主要技术问题,即机组运行的稳定性、机组的推力轴承、发电机冷却方式、发电机中性点接地方式和左。
Several major technical problems on the electric and mechanical aspect of the Three Gorges project are discussed briefly, namely the stability of unit operation, thrust bearing of units, cooling ways of generators, neutral grounding ways of generators, and the left and the right terminal converter stations.
出处
《中国三峡建设》
1995年第6期24-11,54,共3页
China Three Gorges Construction