摘要
三峡工程的永久通航建筑物主要由双线5级连续船闸和垂直升船机组成,施工期的临时通航建筑物包括导流明渠和临时船闸。本文介绍这些通航建筑物的布置、尺寸,主要工程量和工程进度安排。
The permanent navigation structure of the Three Gorges Project mainly consists of successive double-way 5 step flight shiplocks and a vertical shiplift.Its temporary navigation structure includes an open diversion channel and a temporary shiplock. This paper presents the layouts, dimensions, main work quantities and job schedules of these structures
出处
《中国三峡建设》
1995年第3期6-9,46,共5页
China Three Gorges Construction
关键词
三峡工程
通航建筑物
导流明渠
施工
Construction Shiplock Shiplift Navigation structure Constructure schedule