摘要
通过对沙沱电站2#水轮机座环现场打磨工艺的介绍,总结了大面积手工打磨组合面的方法和应注意的事项,并对水轮机预埋件的设计思路进行探讨性的改进,从而减少了加工难度和安装难度。
This article introduces the 2# turbine ring grinding process in Shatuo hydropower station, summarizes the method and matters of large area hand grinding combined surface, and improves the design method of the hydraulic turbine embedded parts, thereby reduces the processing and installation difficulty.