摘要
论文结合安装现场的实际条件,提出"倒挂正装"的工艺创新,并介绍了该工艺的实施安装和实践效果。分析介绍了乌江思林水电站大型压力钢管"倒挂正装"安装创新技术,为大型压力钢管安装提供参考借鉴。
Combined with physical conditions, this article analyzes the Hang Upside Down and Erect Normally technology of large penstock in Wujiang River Silin hydropower station,and introduces the implementation and the practice effect, which provides references for others in the course of large penstock erection.
出处
《工程建设与设计》
2013年第S1期83-84,共2页
Construction & Design for Engineering
关键词
思林电站
压力钢管
“倒挂正装”
Silin hydropower station
penstock
Hang Upside Down and Erect Normally