摘要
钢结构预拼装技术是钢构件成品检验的一项重要的技术措施,结合土耳其ATLAS(1+1)×600 MW超临界燃煤电站,阐述了应用计算机模拟预拼装技术,解决了复杂钢构件预拼装的难题,提高了钢结构的制作质量和效率。
Steel structure pre-assembly technology is an important technical measure for inspection of steel components finished product.In this paper,combined with Turkey ATLAS(1 + 1) × 600 MW supercritical coal-fired power station,it was expounded the application of the preassembly technology simulated by computer to solve the problem of preassembly of complex steel components,and improve the quality and efficiency of manufacture of steel structures.
出处
《工业建筑》
CSCD
北大核心
2013年第S1期722-723,713,共3页
Industrial Construction
关键词
计算机模拟预拼装
三维建模
全站仪
测量坐标
simulation of preassembly by computer
three dimensional modeling
total station
measurement coordinate