摘要
以某高薄壁双曲线冷却塔爆破拆除为例,详细介绍了其数值模拟全过程,其模拟结果与实际较吻合,可以为类似工程数值模拟提供参考。
Taking the explosive demolition of a high-thin wall hyperbolic cooling tower for example,it was described in detail its all course of the numerical simulation,and the simulated results agreed basically with its actual conditions,which provided a reference for the simulation of similar projects.
出处
《工业建筑》
CSCD
北大核心
2013年第S1期848-851,共4页
Industrial Construction
关键词
冷却塔
数值模拟
爆破拆除
cooling tower
numerical simulation
explosive demolition