期刊文献+

基于过渡代价的铜闪速熔炼工况过渡过程优化策略

Transient cost-based optimization scheme of transient procedure for copper flash smelting process
下载PDF
导出
摘要 针对铜闪速熔炼工况动态过渡过程中过渡时间长、工况波动大、资源浪费严重的问题,提出基于过渡代价的铜闪速熔炼工况动态过渡过程优化策略。该策略通过融合过渡时间与过渡资源消耗,构造过渡代价函数,并形成以该函数为目标的熔炼工况过渡过程优化问题。为此,通过构建熔炼工况动态关系模型搭建过渡时间、资源消耗与工况状态过渡过程之间的关系,并通过建立工况波动约束关系式确保过渡过程的平稳性。最后,借助Legendre伪谱法将该问题转化为易于求解的非线性规划问题进行求解。实际应用结果表明所提策略的有效性、可行性。 Considering the defects that much and many resources are needed and dramatic state fluctuation exists in the dynamic transient procedure for copper flash smelting process,a transient cost-based optimization scheme of dynamic transient procedure for copper flash smelting process was proposed.By integrating transient time and transient resources consumption,a transient cost function was presented to achieve optimization.In order to solve the problem,the dynamic modeling of copper flash smelting process was developed to construct the relationship among transient time,resources consumption and working states,and the state fluctuation constraint was presented to ensure the smoothness of working states during transient procedure.Finally,by using Legendre pseudospectral method,the optimization problem was converted into a mathematical programming problem,which can be dealt with the well-developed parameter optimization algorithms.The simulation results of actual production data collected are given to verify the effectiveness and feasibility.
出处 《中南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2013年第9期3587-3592,共6页 Journal of Central South University:Science and Technology
基金 国家杰出青年科学基金资助项目(61025015) 国家自然科学基金资助项目(61273186 61074177)
关键词 过渡过程 过渡代价函数 操作参数轨迹优化 动态模型 LEGENDRE伪谱法 transient procedure transient cost function operational parameters trajectories optimization dynamic modelling Legendre pseudospectral method
  • 相关文献

参考文献7

  • 1喻寿益,王吉林,彭晓波.基于神经网络的铜闪速熔炼过程工艺参数预测模型[J].中南大学学报(自然科学版),2007,38(3):523-527. 被引量:21
  • 2Daniel Hodouin.Methods for automatic control, observation, and optimization in mineral processing plants[J]. Journal of Process Control . 2010 (2)
  • 3D.R. Higgins,N.B. Gray,M.R. Davidson.Simulating particle agglomeration in the flash smelting reaction shaft[J]. Minerals Engineering . 2009 (14)
  • 4桂卫华,王凌云,阳春华,谢永芳,彭晓波.Intelligent prediction model of matte grade in copper flash smelting process[J].中国有色金属学会会刊:英文版,2007,17(5):1075-1081. 被引量:11
  • 5Iiro Harjunkoski,Hans Werner Borchers,Marco Fahl.Simultaneous scheduling and optimization of a copper plant[J]. Computer Aided Chemical Engineering . 2006
  • 6S.-L J?ms?-Jounela,M Vermasvuori,P Endén,S Haavisto.A process monitoring system based on the Kohonen self-organizing maps[J]. Control Engineering Practice . 2003 (1)
  • 7M. Nagamori.Metal loss to slag: Part I. Sulfidic and oxidic dissolution of copper in fayalite slag from low grade matte[J]. Metallurgical Transactions . 1974 (3)

二级参考文献17

共引文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部