摘要
在不破坏地下人防工事的前提下,对本工程场地内存在的2条贯通场区的人防干道及3个人防竖井,分别提出基础跨越,深梁(剪力墙)托柱转换跨越等结构处理方式,取得了较好的效果。
There were two passageways crossing the site and three shafts,avoiding the air-raid shelter destruction,this paper proposed some measurement in foundation design such as foundation crossing,supporting column transfer deep beam( shear wall) crossing. And good results were obtained.
出处
《建筑结构》
CSCD
北大核心
2013年第S1期932-934,共3页
Building Structure
关键词
地基
防空洞
深梁
foundation
air-raid shelter
deep beam