摘要
合肥南站北广场地下空间结构设计存在多处难点:与周边地铁站、国铁站房的关系及处理;基坑开挖面积大、深度较深;地基基础不一致、沉降不均匀;地上结构超长不设缝,地下室抗浮。设计中采用相应技术措施予以解决。
The structural design of Hefei South Railway Station North Plaza underground space faced many difficulties such as relationship and deal with the surrounding metro and railway station,the excavation area is large and deep,the foundation is not consistent and has differential settlement,super-length structure without settlement joints,flotage of underground water.Echnology measures were adopted to solve the above difficulties.
出处
《建筑结构》
CSCD
北大核心
2013年第S2期26-29,共4页
Building Structure
关键词
交通枢纽
结构设计
地下空间
transport hub
structure design
underground space