摘要 高层建筑通常周边带有裙房,因建筑功能的要求,高层建筑主楼与裙楼之间不能设缝。针对无锡CBD项目的设计特点,在基础设计中采用变刚度调平的原理对桩筏进行优化设计,选择合理的桩和筏板厚度。为了控制主楼与裙楼的差异沉降,在主楼与裙楼间设置沉降后浇带。对地下水位较深的地下室底板采用包络设计的方法,使底板计算更加安全合理。 High-rise buildings usually have podium buildings around and joints cannot be set between the main building and podium buildings due to architecture functions.According to the characteristics of the CBD project in Wuxi,variable rigidity design for balancing settlement was adopted in order to optimize the piled foundation and select proper pile and raft foundation thickness.To reduce the differential settlement between the main building and podium buildings,post-pouring settlement belts were set.Envelope design method was adopted in foundation slab design to ensure safety when water table is very deep.
作者 刘克勋
出处 《建筑结构》 CSCD 北大核心 2013年第S2期598-600,共3页 Building Structure
关键词 超高层 变刚度调平设计 沉降后浇带 抗浮设计 super high-rise building variable rigidity design post-pouring settlement belt anti-floating design
  • 相关文献

参考文献1

二级参考文献5

  • 1朱春明,邱明兵,刘铁锐,刘华.沉降后浇带在共同作用分析中的模型和实例[J].建筑结构,2011,41(S1):1235-1239. 被引量:4
  • 2JGJ94-2008建筑桩基技术规范[S].北京:中国建筑工业出版社,2008.
  • 3.GB50007-2002建筑地基基础设计规范[S].北京:中国建筑工业出版社,2002..
  • 4上海岩土工程勘察设计研究院有限公司.中宇国际大厦岩土工程勘察报告(详勘)[R].2008.
  • 5中国建筑科学研究院.JCCAD用户手册及技术条件[M].2008.

共引文献2

同被引文献6

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部