摘要
通过对国内外反应堆主设备吊运安装技术特点、主设备安装要求、反应堆厂房布置的研究,借鉴以往主设备安装工艺的优化与改进经验,确定一套适用于M310堆型的反应堆主设备安装工艺,并研制出满足实际工程建设所需的主设备安装专用工具。
Depending on the research of the technical characteristics and installation requirements of the main equipments in a nuclear project,as well as the disposition of the nuclear power plant,the installation techniques of the main equipments′s was optimized and improved experience.Based on that,a systemic installation techniques which could be used in M310 nuclear power plant is finally carried out,and all the devices used in the installation were designed,which indicated that both the techniques and the devices needed in the installation firstly localization.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
2013年第S1期162-163,171,共3页
Nuclear Power Engineering
关键词
主设备
安装工艺
专用工具
Major Components,Erection techniques,Special fixture