期刊文献+

悬臂梁荷载图表计算过程中的重量处理方法 被引量:2

Weights Calculation Method in the Load Chart Programming for Jack-up Rig
下载PDF
导出
摘要 为了编制自升式钻井平台钻井荷载表,需要考虑悬臂梁结构外伸到包络线内任意位置时大钩荷载、立根、悬臂梁钻台结构重量等在悬臂梁左右侧壁梁在支撑点位置产生的弯矩和剪力值,以及悬臂基座上的支反力,从而评定是否超过结构强度许可范围。通常这些重量因子被简化处理以近似模拟实际加载情况,列出了常用的几种重量加载简化方法并加以比较,最终确定较为准确的计算方法。 In order to get the load chart for jack up rig, the reaction force on the foundation of cantilever, the moments and shear forces are taken into considered on the bulkheads of the cantilever on the pushup section, which are induced by the weights of hook load, setback load, and the weight caused by drill floor, derrick hull structure, and the drilling equipment arranged on them and so on. Usually these weights and positions are simplified for easy evaluation. In this paper, it analyzes the popularly accepted methods and confirms a preferable resolution in the end.
出处 《船舶工程》 北大核心 2013年第S2期23-24,71,共3页 Ship Engineering
关键词 自升式钻井平台 荷载图表 悬臂梁 jack-up rig load chart cantilever
  • 相关文献

参考文献1

二级参考文献7

共引文献8

同被引文献6

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部