摘要
介绍了襄阳生活垃圾焚烧发电厂汽轮发电机的结构特点,施工准备,安装工艺流程及注意事项,并对安装方法进行了详细描述。
This paper introduced the structural features of the turbogenerator in Xiangyang household garbage incineration power plant,as well as the preliminary work for its construction,installation process,technologies and precautions.A detailed description has been given to its installation.
出处
《施工技术》
CAS
北大核心
2013年第S1期215-221,共7页
Construction Technology
关键词
发电厂
汽轮发电机
安装
power plants
turbogenerator
installation