宁波某项目管道工期紧,管线多,排列密集,管配件多、规格复杂,管道的焊接质量要求高、难度大。通过制定合理的管道焊接质量控制措施,有效确保了工程质量和工期,取得良好的效果。
Some industrial pressure pipe project in Ningbo has the difficulties of the higher requirements in workmanship,construction difficulties,numerous unsafe factors,complex procedures and heavy interruption and tight schedule,and the high requirements on the pipe welding.Through making reasonable quality control measures on pipeline welding,the welding quality and construction time are ensured.
出处
《施工技术》
CAS
北大核心
2013年第S1期241-243,共3页
Construction Technology
关键词
焊接
质量
工期
管理
welding
quality
construction time
management