期刊文献+

矩形顶管施工的数值模拟研究 被引量:16

Study on Numerical Simulation of the Rectangular Pipe Jacking Construction
下载PDF
导出
摘要 结合包头市阿尔丁大街地下通道顶管工程,采用三维有限元计算软件ANSYS模拟了矩形顶管施工的过程,着重分析了在动力荷载作用下的矩形顶管施工对施工现场周围土体位移产生的影响。通过研究,得到了矩形顶管施工对土体扰动的影响范围以及在横、纵两个方向上的变化规律,并与工程实测资料进行了对比,证明了数值模拟对顶管法施工有重要的工程指导意义。 Combined with the city of Baotou Arden Street underground passage pipe jacking engineering,three-dimensional finite element software ANSYS is used to simulate the process of rectangular pipe jacking construction.The analysis pay emphasis on the influence of soil displacement around the construction site of the rectangular pipe jacking construction under dynamic loads.Through research,it got the rectangular pipe jacking construction sphere of influence of soil disturbance,the variation in both horizontal and vertical direction,and compared with the measured data.It proves that the numerical simulation has important guiding significance to the pipe jacking construction.
出处 《施工技术》 CAS 北大核心 2013年第S1期410-412,共3页 Construction Technology
关键词 矩形顶管法 数值模拟 土仓压力 注浆压力 顶进速度 rectangular pipe jacking method numerical simulation earth pressure grouting pressure driving speed
  • 相关文献

参考文献1

二级参考文献8

共引文献141

同被引文献97

引证文献16

二级引证文献78

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部