为了提高公路工程的质量、进度,并节约成本,在国道315线察汗诺至德令哈公路工程B标合同段对混凝土构件预制提出了两种预制方式:分散预制和集中预制。本文对这两种方式进行了多方面比较,提出了最优方案以指导施工。
In order to improve the quality ,schedule and cost saving etc of highway engineering ,two pre-fabrication methods of precast concrete unit are put forward in the bidding B contract period from Chahannuo to Delingha highway in the National Highway 315 ,such as dispersing and centralized prefabrication .The two methods were compared in several aspects ,and we put forward the optimum plan to guide construction .