期刊文献+

为减轻红石岩堰塞湖防洪压力的德泽水库防洪调度研究 被引量:2

Flood Management in Deze Reservoir aimed at Flood Risk Mitigation in Barrier-Lake of Hongshiyan
下载PDF
导出
摘要 鲁甸"2014.8.3"地震牛栏江红石岩堰塞湖永久整治期间,牛栏江流域防洪压力增大。为有效减轻红石岩堰塞湖防洪压力,对德泽水库防洪调度方案进行研究。分析了德泽水库、红石岩堰塞湖及区间设计洪水峰量,以及有、无水库调节对堰塞湖的影响差异,确定了德泽水库4种泄洪方案相应的堰塞湖最大洪峰流量、水位变幅等,认为德泽水库错峰调度对于减轻红石岩堰塞湖永久整治期间的防洪压力和促进安全生产有着重要意义,提出了确保施工安全的措施建议。 Niulanjiang-Basin has faced an intensify flood risk after'2014.8. 3'earthquake which formed a large barrier- lake. This paper reviewed flood control system of Deze reservoir. In order to reduce flood risk in Hongshiyan, the designed peak discharge in both Deze reservoir and barrier-lake of Hongshiyan and impact of the reservoir to barrier-lake were analyzed. The peak discharge and water level variation under four different plans of flood conveying were determined. Flood peak staggered dispatching in Deze reservoir is suggested to mitigate flood risk, and safety construction measures are proposed.
出处 《中国防汛抗旱》 2015年第3期62-65,共4页 China Flood & Drought Management
关键词 防洪调度 德泽水库 红石岩堰塞湖 Flood control management Deze reservoir barrier-lake in HongShiyan
  • 相关文献

参考文献2

共引文献23

同被引文献16

  • 1云南省水文水资源局昭通分局.昭通市水文特性研究[R].昭通:云南省水文水资源局昭通分局,1997.
  • 2红石岩堰塞湖应急处置指挥部水文监测预警组牛栏江红石岩堰塞湖水文气象监测预报预警方案[R]2014.
  • 3云南省水利水电厅.云南省洪水调查资料[R].2000:45-47.
  • 4红石岩堰塞湖应急处置指挥部水文监测预警组.鲁甸"803"地震牛栏江红石岩堰塞湖雨水情概况及可能最大洪水分析[R].2014.
  • 5云南省防汛抗旱指挥部办公室,云南省水文水资源局.云南省省级水文报汛站防汛水文特征值测定报告[R].2010.
  • 6中国电建集团昆明勘测设计研究院有限公司,长江水利委员会专家组,云南省昭通市水利水电勘测设计研究院.云南省鲁甸"8.03"地震牛栏江红石岩堰塞湖应2-8险处置报告[R]2014.
  • 7全国山洪灾害防治规划领导小组办公室山洪灾害临界雨量分析计算细则(试行)[R].2003.
  • 8水利部水文局(水利信息中心)编中小河流突发性洪水监测与预警预报技求研究[M].北京:科学出版社,2010.
  • 9云南省水利水电厅暴雨洪水计算办公室.云南省暴雨径流查算图表[R]1992.
  • 10宋昭义.昭通市水资源变化趋势分析[J].水资源研究,2009,30(4):21-23. 被引量:3

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部