考虑风电不确定性的电网备用优化决策方法研究 被引量:5

Study of Optimized Backup Method for Power Grid Considering the Uncertainty of Wind Power
下载PDF
导出
摘要 基于风电并网的国内外研究的基础上,主要进行了风电不确定性的电网备用优化决策方法研究。利用风电不确定性、机组强迫停运率和负荷波动三方面建立系统的不确定性模型。以最小化备用成本为目标,并分别以解析法和mentocarlo模拟法求解系统的可靠性指标作为约束条件,构建确定系统所需的最优旋转备用容量的数学模型。对接有风电场的IEEE RTS96系统仿真,反映了相同的备用需求随风速变化的趋势,并比较得出模拟法得到的备用结果比解析法大。在此基础上,该方法还可以对风速预测偏差,风电渗透功率对系统所需旋转备用的影响进行进一步分析。 Based on studies on the wind power integrated grid at home and abroad,this paper focuses on the study of the optimized backup method for the power grid considering uncertainty of wind power. Simulation based on uncertainty of wind power,rate of the forced unit outage and load fluctuation is considered. The mathematical model is built to quantify the best spinning reserve capacity as required with analytical method and Mento-Carlo simulation as restrains, aiming at minimizing the cost. The system simulation of the power grid connected wind forms by IEEE RTS96 R indicates the change trend of the reserve demand with the change of wind speed and it also shows that the reserve result obtained with the simulation method is large than that obtained with the analytical method.Based on these results,this method can further analyze the deviation of the wind speed from the forecast and the influence of the wind power penetration on spinning reserve.
作者 殷超
出处 《电网与清洁能源》 北大核心 2015年第4期106-112,118,共8页 Power System and Clean Energy
关键词 风电并网 旋转备用 失负荷概率(LOLP) 电量不足期望值(EENS) 解析法 wind integrated grid spinning reserve loss of load possibility expected energy not supplied analytical method
  • 相关文献

参考文献29

二级参考文献348

共引文献1254

同被引文献69

  • 1张程飞,黄俊辉,谢珍建,袁越,张新松.电网风电接纳能力评估方法综述[J].电网与清洁能源,2015,31(3):99-105. 被引量:19
  • 2孟祥星,韩学山.一种新的计及备用约束的调度模型[J].电网技术,2005,29(14):20-25. 被引量:13
  • 3陈海焱,陈金富,段献忠.含风电场电力系统经济调度的模糊建模及优化算法[J].电力系统自动化,2006,30(2):22-26. 被引量:216
  • 4王乐,余志伟,文福拴.基于机会约束规划的最优旋转备用容量确定[J].电网技术,2006,30(20):14-19. 被引量:78
  • 5葛炬,王飞,张粒子.含风电场电力系统旋转备用获取模型[J].电力系统及其自动化,2010,34(6):32-34.
  • 6KAZARL1S S A,BALDRTZIS A G,PETRIDIS V. A Genetic Algorithm Solution to the Unit Commitment Problem[J]. IEEE Transactions on Power Systems, 1996, 11 ( 1 ) :83- 92.
  • 7GOOI H B,MENDES D P,BELL K R W,et al. Optimal Scheduling of Spinning Reserve[J]. IEEE Transactions on Power Systems, 1999,14(4):1485-1490.
  • 8BOUFFARD F,GALIANA F D. Stochastic Security tot Operations Planning With Significant Wind Power Genera- tion[J]. IEEE Transaction on Power Systems,2008,23 (2): 306-316.
  • 9TSUNG Y L. Optimal Spinning Reserve for a Wind-thermalPower System Using EIPSO[J]. IEEE Transactions on Power Systems,2007,22(4) : 1612-1621.
  • 10DOHERTY R, MALLEY M O. A New Approach to Quantify Reserve Demand in Systems With Significant Installed Wind Capacity[J]. IEEE Transactions on Power Systems, 2005,20 (2) :587-595.

引证文献5

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部