期刊文献+

联合循环机组维护成本建模及求解 被引量:9

Maintenance Cost Optimization for Combined Cycle Gas Turbines
下载PDF
导出
摘要 为更加准确合理计算联合循环机组发电成本,在传统联合循环机组组合模型基础上,引入联合循环机组维护成本模型,该模型的难点是启机维护成本和运行维护成本在同一计算周期内的互斥关系。针对这一难点,首先将启机维护成本叠加到模式转移成本中考虑,然后通过分析联合循环机组中燃气轮机在计算周期内是否有启机,确定目标发电成本是否考虑运行维护成本,同时使用线性化技巧等价变换非线性表达为线性表达,建立MIP模型。利用系统实际运行数据对文中模型进行测试,测试表明该模型有效解决联合循环机组维护成本问题,优化结果合理。 In order to accurately calculate the generating cost of the combined cycle gas turbine (CCGT),this paper introduces the maintenance cost model of CCGT based on the traditional model. The difficulty of this model is that the start-up and operation maintenance cost does not coexist in the same calculation period. For this purpose,first we can computer the start-up maintenance cost by superposing it to the mode transition cost,and then by analyzing whether the gas turbine of CCGT starts up in the calculation period we can determine whether to add operation maintenance cost to the target cost. Meanwhile,we can transfer the non-linear expression to the linear expression by linearization techniques and establish the mixed integer linear program. This paper uses the actual data of Macao for testing. The testing shows that the model can effec-tively solve the maintenance cost of CCGT with more reasonable results.
出处 《电网与清洁能源》 北大核心 2015年第6期6-11,32,共7页 Power System and Clean Energy
基金 国家高技术研究发展计划(863计划)资助项目(2012AA050207)~~
关键词 联合循环机组 混合整数线性规划 启机维护成本 运行维护成本 模式转移 combined cycle gas turbine mixed integer linear programming start-up maintenance cost running maintenance cost mode transition
  • 相关文献

参考文献15

  • 1徐帆,姚建国,耿建,杨争林.考虑联合循环机组的机组组合模型及求解[J].电力系统自动化,2010,34(8):39-43. 被引量:9
  • 2丁晓莺,刘林,王锡凡,王建学.考虑灵活运行机组的随机机组组合模型[J].电力系统自动化,2009,33(18):23-27. 被引量:13
  • 3Lu, Bo,Shahidehpour, Mohammad.Short-term scheduling of combined cycle units. IEEE Transactions on Power Systems . 2004
  • 4Li, Tao,Shahidehpour, Mohammad.Price-based unit commitment: A case of Lagrangian relaxation versus mixed integer programming. IEEE Transactions on Power Systems . 2005
  • 5Lu, Bo,Shahidehpour, Mohammad.Unit commitment with flexible generating units. IEEE Transactions on Power Systems . 2005
  • 6Liu, Cong,Shahidehpour, Mohammad,Li, Zuyi,Fotuhi-Firuzabad, Mahmoud.Component and mode models for the short-term scheduling of combined-cycle units. IEEE Transactions on Power Systems . 2009
  • 7Fu, Yong,Shahidehpour, Mohammad.Fast SCUC for large-scale power systems. IEEE Transactions on Power Systems . 2007
  • 8Croxton, Keely L.,Gendron, Bernard,Magnanti, Thomas L.A Comparison of Mixed-Integer Programming Models for Nonconvex Piecewise Linear Cost Minimization Problems. Management Science . 2003
  • 9CHANG G W,CHUANG G S,LU T K.A si mplified combined-cycle unit model for mixed integer linear programming-based unit commit ment. Proceedings of IEEE PES General Meeting . 2008
  • 10RIFAAT R M.Economic dispatch of combined cycle cogeneration plants with environmental constraints. Proceedings of IEEE EMD’’98 1998 International Conference . 1998

二级参考文献31

  • 1杨朋朋,韩学山,王静,孟祥星.用拉格朗日松弛法求解概率备用解析表达的机组组合[J].山东大学学报(工学版),2007,37(2):58-62. 被引量:7
  • 2BOBO D R, MAUZY D M, TREFNY F J. Economic generation dispatch with responsive spinning reserve constraints. IEEE Trans on Power Systems, 1994, 9(1) : 555-559.
  • 3SIDDIQI S N, BAUGHMAN M L. Reliability differentiated pricing of spinning reserve. IEEE Trans on Power Systems, 1995, 10(3): 1211-1218.
  • 4GOOI H B, MENDES D P, BELL K R W, et al. Optimal scheduling of spinning reserve. IEEE Trans on Power Systems, 1999, 14(4): 1485-1490.
  • 5BILLINTON R, FOTUHI-FIRUZABAD M. A basic framework for generating system operating health analysis. IEEE Trans on Power Systems, 1994, 9(3): 1610-1617.
  • 6BILLINTON R, KARKI R. Capacity reserve assessment using system well-being analysis. IEEE Trans on Power Systems, 1999, 14(2): 433-438.
  • 7BILLINTON R, ALLAN R N. Reliability evaluation of power systems. New York, NY, USA: Plenum Press, 1994.
  • 8ZHAI D, BREIPOHL A M, LEE F N, et al. The effect of load uncertainty on unit commitment risk. IEEE Trans on Power Systems, 1994, 9(1): 510-517.
  • 9CHATTOPADHYAY D, BALDICK K R. Unit commitment with probabilistic reserve// Proceedings of IEEE Power Engineering Society Winter Meeting: Vol 1, January 27-31, 2002, New York, NY, USA: 280-285.
  • 10RIFFAT R M. Economic dispatch of combined cycle cogeneration plants with environmental constraint// Proceedings of IEEE Energy Management and Power Delivery Conference, March 3-5, 1998, Singapore: 149-153.

共引文献19

同被引文献99

引证文献9

二级引证文献65

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部