归纳总结综采工作面过冲刷带的方法,分析了影响综采工作面过冲刷带方法选择的因素,探讨综采工作面在过冲刷带构造时如何科学、合理地选择方法。通过榆家梁煤矿52406综采工作面采用松动爆破结合采煤机截割的方法过冲刷带的实践,对结论进行了验证。
Summary the methods of going through scouring zone in fully-mechanized working face.Analyse the influencing factors of the choice of methods of going through scouring zone in fully-mechanized working face. Discuss how to choose the scientific and reasonable method when going through scouring zone in fully-mechanized working face. To verify this conclusion by practice of Yujialiang coal mine No.52406 fully-mechanized working face by the way of loose blasting and coal winning machine cutting.